CircuitFlowELECTRICAL CONSTRUCTION
ELECTRICAL INSTALLATION PROGRESS TRACKING

From MV supply
to the final circuit.

Electrical construction progress tracking for panels, circuits, LV cables and installation points. See what is installed, what is tested and which electrical status has been recorded.

Installation stages Supply relationships Recorded electrical status
ELECTRICAL SYSTEM OVERVIEWILLUSTRATIVE PROJECT
SUPPLY TOPOLOGY Confirmed relationship
OUTGOING CIRCUITS
C01Sockets
C02Lighting
C03Floorboxes
DB.L01 · distribution boardInstallation 75%Electrical status Energised
MV → LV → Distribution → Small PowerClick a panel to inspect
ONE CONNECTED PROJECT RECORDPanelsCircuitsCablesLightingInstallation pointsCommissioning
01 / PROJECT VISIBILITY

See the system.
Understand the work still to do.

Move between the supply structure, individual circuit records and installation progress. The example below shows how the information fits together.

DEMONSTRATION DATA
SUPPLY TOPOLOGY Confirmed relationship
OUTGOING CIRCUITS
C01Sockets
C02Lighting
C03Floorboxes
DB.L01 · distribution boardInstallation 75%Electrical status Energised

Recorded status, not live voltage monitoring. Installation completion does not confirm energisation or isolation. Site checks and electrical safety procedures remain essential.

02 / WHAT YOU TRACK

Built around electrical
construction delivery.

A connected view of physical installation, electrical relationships and the evidence behind reported progress.

01

Panels & power distribution

Connect upstream sources, distribution boards and outgoing circuits. Review supply relationships with their source references.

  • Panel delivery and installation
  • Source and destination relationships
  • Documented supply topology
02

Circuits & physical cables

Know which cable serves each circuit and which work stages remain. Keep installation records connected to the electrical system.

  • Cable IDs, types and sizes
  • Pulling, dressing and terminations
  • Dead tests, live tests and documentation
03

Small Power & Lighting

Track sockets, switches, luminaires, device connections and floorboxes at their actual locations on the drawings.

  • Location and point based progress
  • Installation stages and photographs
  • Lighting types and quantity reports
04

Electrical status

Record energised, confirmed isolated, pending isolation and unverified states separately from physical installation progress.

  • Status for panels and circuits
  • Confirmation records and history
  • Unknown information stays visible
05

Testing & commissioning

Bring test results, installation milestones and commissioning evidence into the same project context.

  • Dead and live test records
  • Red, Yellow and Green tag milestones
  • Evidence, signatures and outstanding items
06

Progress & coordination

Turn recorded site work into a clearer view of progress, outstanding scope and the issues affecting delivery.

  • Progress dashboards and reports
  • Blockers linked to project elements
  • Planned and actual manpower
03 / FROM DRAWING TO PROGRESS REPORT

Follow the work.
Keep the engineering context.

The same panel, circuit or installation point connects the drawing, the site update and the progress report.

01

Build the project structure

Organise documentation, buildings, floors and packages. Review the panel and circuit registers and their source references.

02

Locate the installation

Open a drawing, identify a point and connect it to its panel, circuit and location. Keep drawing revisions in context.

03

Record the work and evidence

Update installation stages, add photos, record test information and raise blockers against the relevant element.

04

Review progress and outstanding scope

Use dashboards and reports to follow delivery, coordinate manpower and inspect missing work before commissioning.

INSTALLATION RECORDEXAMPLE
PHYSICAL CABLE

CBL.1043

DB.L01 → JB.L01.02

Associated circuit
DB.L01 / C02
Cable installation
Pulled and dressed
Termination
Source + destination complete
Dead test
Result recorded
Live test
Pending
Electrical status
Confirmed isolated
Evidence stays with the recordPhotos · test documentation · dated history
04 / CLEAR STATUS, BETTER DECISIONS

Installed?
Tested?
Energised?

These are different questions. CircuitFlow keeps physical work, test records, commissioning milestones and electrical status distinct.

Different records. One project context.EXAMPLE
InstallationCable pulled, terminated and labelledPhysical work
TestingDead test complete, live test pendingTest evidence
CommissioningTag milestone and supporting evidenceReadiness record
Electrical statusConfirmed isolatedRecorded safety status
05 / YOUR PROJECT SETUP

Built for small projects.
Structured for large installations.

From a small installation or a single package to a large electrical project with multiple buildings, floors and teams. Define the project scope, installation stages, user responsibilities and reporting requirements around the work you need to deliver.

Multilingual. Multiple companies. One project.

Work in a multilingual interface, including English and Polish. Bring the client, appointing organisation, General Contractor and subcontractors into the same project, with assigned users, company affiliations, roles and access to the relevant work packages.

Share the project context while controlling who can view information, report installation progress and review submitted work. Coordinate a small team or several companies across a larger installation.

Multiple companies and project roles Multilingual interface Buildings, levels and packages Agreed installation stages
06 / CONTACT & PROJECT ENQUIRIES

Tell us about
your next project.

Need a presentation, a project proposal or help deciding how CircuitFlow could fit your installation workflow? Tell us what you are building.

contact@circuitflow.tech
Small installationsIndividual work packagesLarge electrical projects

This form opens a draft in your email application. Review the message and send it from your own account.